Change order for Michael M. - Change from the original order of 30" tall to 36" tall
Black Pipe Table Base "DIY" Parts Kit, 1" X 32" Long X 12" Wide X 36" Tall
Black Pipe Complete Table Frame "DIY" Parts Kit.
If this frame doesn't quite match up with your table top we can customize a table leg frame for you. Message me your specifications and I'll send you a quote.
Cleaning of pipe and assembly is required.
The Black Iron Pipe table base in raw iron pipe gives the coolest, most contemporary look to your tabletop. If you want a rustic and Industrial or Steampunk style in your home, then you should buy this table frame. The frame is delivered unassembled in 1" pipe and fittings is easy to screw together by hand or with a pipe wrench.
Follow the trend and create your own personal table by selecting a well-designed Industrial Pipe frame for your DIY tabletop. With a set of Pipe table legs you are bringing one of the most popular and trendy details into your home and adding a modern and stylish look.
Our forged iron table legs are stylish, elegant and suit all kinds of tabletops. We have developed our table frames with a focus on a stylish look and great functionality. The holes in the top of the table legs make it easy to mount on wood and the threaded pipes are adjustable for uneven floors.
With the Pipe Design table legs/frame in iron pipe, you get a super flexible and extremely durable solution. The model is available in 3 different sizes, but is also offered in special sizes and can therefore be used for everything from dining tables, office tables, and coffee tables to high tables and computer tables.
The table legs in the Pipe Design in raw iron gives a raw and industrial look.***Please note: all table base measurements (width and length) that are stated in this listing are measured from the outside edges of the round flanges on top of the base. Please reference the Q & A section in my Etsy shop for instructions on cleaning and more details regarding the black pipe products sold in my store.Assembly instructions for the "DIY" kits will be emailed to your Etsy account email once you have placed your order.
Let me know if you have any questions.
Just contact me within: 3 days of delivery
Ship items back to me within: 14 days of delivery
"Black pipe" is the construction industry name used for this type of piping. It is dark in color (not black but a more dark gray color) unpainted steel like what is used in construction projects. This is typically what is often used in authentic industrial decor and interior design. The "black pipe" is paintable.
The black pipe "DIY" items are delivered as a parts kit and need to be cleaned (please read the listing product description). They have a thin coating to protect the pipe from scratching during shipping/delivery. I like to use A degreaser from Home Depot like ZEP 505 or a similar product in the spray bottle. Simply spray on the pipe and wipe off. Repeat this a few times to be sure all of the remaining coating is clean.
Many of our products are customizable including the shelving units and table base frames. If you have an idea for one of these items message me with your idea and include as many details as possible (with a sketch or photo example if you have one). Typically I can give you a quote for a table frame if I have the desired pipe diameter (1/2", 3/4", or 1"), length, width/depth, and height.
For shelving units I will need height (from ceiling to the bottom of the unit), shelf depth, space in between each shelf (in inches), number of shelves you want and the diameter size of pipe (1/2", 3/4", or 1" available).